Motion Computing FWS-DS1 Manuale Utente Pagina 77

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 257
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 76
GTE
-
Florida
Unbundled Network Element
(UNE)
Non-Recurring Cost Study
New Orders for Exchange
-
Comulex
UNERJNE-P:
The FAC manually assigns the cable
paidcentral office line equipment. DBM codes and inputs switch translations. VIVID
monitors all critical dates for Complex Digital services.
Change Orders for Exchange
UNEs:
There are three types of changes the CLEC can
order. When the CLEC orders changes in vertical features, the translations generally
flow-through to the switch electronically. Changes in Switch Feature Groups for
CentraNet and ISDN BRI ports require manual coding and input by the DBM. Changes
of C.O. Interconnection require manual assignment by the FAC.
Disconnect Orders for Exchange
UNEM-P:
The FAC manually updates
AAIS
records. Vertical features are disconnected electronically. Complex switch translations
are removed by the DBM.
/-.
Other Services
The FAC may be involved
in
Coordinated Conversion or Hot Cut Coordinated
Conversion for Exchange UNEs.
The Coordinated Conversion for the FAC is estimated to require
15
minutes of a service
coordinator’s time. If the CLEC is not ready to authorize the conversion when the FAC
calls for the first time, additional telephone calls will be required. The FAC
is
involved
in five or more phone calls with the GTE field and CLEC personnel. The 15-minute
estimate is the lower bound on the time required for a Coordinated Conversion in the
FAC.
Hot Cut Coordinated Conversion
-
this process requires all of the activities described
above for Coordinated Conversions. However, for this process,
all
of the parties remain
on a conference call for the duration of the conversion process. This process requires a
minimum of one hour (phone calls, the hot cut activity, and order completion.)
Additional time (intervals)
is
costed in quarter hour increments at the Loaded Labor Rate
for the provisioning support employees shown in the study.
Costs
for
AdvancedBpecial
UNEsNNE-Ps
GTE costed the following
UNE
activities:
New Orders for Advanced/SDecial -Basic
UNE
:
The FAC manually assigns the cable
pair. The BRPC SOE ensures that
TBS
is updated with the correct order information and
distributes the order electronically to the downstream provisioning groups. BRPC Design
reserves the facilities and equipment, creates the CLRDLR and distributes the CLRDLR
to involved work groups. BRPC Testing Group tests the circuits on the Plant Test Date
(PTD) and coordinates tests .with the Central Office Technician, Field Technician and the
CLEC on the PTD. BRPC Admin clears any jeopardy, handles escalations, and
completes the order.
/4
P
is-FL
6
VhOlellsb
-
June
MM)
Page
6
of
7
Vedere la pagina 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 256 257

Commenti su questo manuale

Nessun commento