Motion Computing FWS-DS1 Manuale Utente Pagina 91

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 257
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 90
GTE
-
Florida
Unbundled Network Element
(UNE)
Non-Recurring Cost Study
.+-.
Office Technician (or CZTBZT) breaks the jumpers, leaving no jumpers between the
CLEC’s terminal block and GTE’s terminal blocks on the frame.
New orders for
UNE-Ps
may require frame jumpers.
If
the line is already connected from
the customer’s premises to the office equipment on the MDF to provide EDT (Express
Dial Tone) or the loop is already connected as with LIJ, then no jumpers will be required.
The data for EDT and LIF is identified in an
AAIS
Central Ofice Activity Report. For
other new
UNE-P
orders, the Central Office Technician will run ajumper from the cable
pair to the office equipment to complete the order.
Migration of existing POTS service to
UNE-P
will not require frame jumper work.
Change Central Office Interconnection
When the CLEC places a change order for Central Office Interconnection, the Central
Office Technician disconnects the “out” jumpers and runs new jumpers according to the
instructions
on
the order. The costs are determined from the Jumper Study.
Costs
of
Other Services
Central Office Technicians may be involved in Coordinated Conversions and Hot Cut
Coordinated Conversions. Time estimates were used to calculate the costs for Central
Office Technicians. The costs reflect estimates of the central office time for a standard
interval and for additional intervals of time when the conversion extends beyond the
standard interval.
.-.
Costs
of
Network Wholesale UNEs
Central Office and Field Installation activity are required for the Network Wholesale
UNEs.
Arthur
Andersen personnel conducted time and motion studies to determine the
activities and the time involved for new installations and disconnects for Switched and
Special Access services. The Access Services correspond directly to Network Wholesale
UNEs,
so
the activities and the times were used in this NRC study. Following is a brief
description of the activities.
For the following Network Wholesale UNEs, Central office activities to run/break
jumpers, activate trunks, and perform call-through testing were costed:
+
Trunk
Ports
-
Trunks, Trunk Facilities,
SS7
Links and
STP
Termination
Enhanced Extended Links (EELS)
Entrance Facilities require both Central Office and Field Installation. The central office
costs (running jumpers and optioning/inserting plug-in cards) are based on the results of a
self-administered time-and-motion study. Field Installation costs are determined from
STAR extracts for BZT/Special Services Technician installation of Special Access
orders.
Page
4
of
8
16-FL
4
wholes&
-
June
ZWO
Vedere la pagina 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96 ... 256 257

Commenti su questo manuale

Nessun commento